Item |
Included Y or N |
Documents Description |
not incl. because |
Remarks |
O |
Y |
Introduction |
||
1 |
Y |
Shipping Documents |
||
2 |
Y |
Transport , Handling , Installation Procedure RO-OCN-TN-3019 |
||
3 |
Y |
Certificate of Conformance |
||
4 |
Y |
Qualification Status List |
||
5 |
N |
Top Level Drawings (Family Tree) |
N/A |
|
6 |
Y |
Interface Drawings RO-OCN-DW-3001 3 Sheets |
||
7 |
Y |
Functional Diagrams |
||
8 |
Y |
Top Level electrical and interface circuit diagrams |
||
9 |
Y |
As build configuration status list |
||
10 |
N |
Serialized Components List |
N/A |
|
11 |
Y |
List of Waivers |
||
12 |
Y |
Copies of Waivers |
||
13 |
Y |
Operations Manuals Deployment : RO-OCN-PR-3003 |
||
14 |
Y |
Historical Record Sheets (Logbook) |
||
15 |
Y |
Operating Time / Cycle Record |
||
16 |
N |
Connector Mating Record |
N/A |
|
17 |
N |
Age sensitive Items |
N/A |
|
18 |
N |
Pressure Vessel History log |
N/A |
|
19 |
N |
Calibration Data Record |
N/A |
|
20 |
Y |
Open Work/Deferred Work/Open Test/Temporary Installation |
Centrifuge Test Sept. 1999 |
|
21 |
Y |
List of Non-Conformance Reports (NCR) |
||
22 |
Y |
Copies of NCR's |
||
23 |
Y |
Test Procedures : 4. Deployment : RO-OCN-PR-3003 5. Centrifuge Test : RO-OCN-PR-3005
|
||
24 |
Y
|
Test Reports : 1. Vibration : RO-OCN-TR-3021 2. TV-Test : RO-OCN-TR-3006 3. Properties : RO-OCN-TR-3002 3.1 Harness Baking : RO-OCN-TR-3002.1
after Assembling 4.1 Deployment : RO-OCN-TR-3003.1 after Vibration 4.2 Deployment : RO-OCN-TR-3003.2 after TV 4.3 Deployment : RO-OCN-TR-3003.3 after Properties 4.4 Deployment : RO-OCN-TR-3003.4 after Centrifuge 5. Centrifuge : RO-OCN-TR-3005 |
|
see separate folder |
25 |
Y |
Mass Record Sheet |
||
26 |
N |
List of Low Level ADP |
N/A |
|
27 |
Y |
Declared Materials List (DML) |
||
28 |
Y |
Declared Parts List /DPL) |
||
29 |
Y |
MGSE Manual |
See Item 2 |
|