NCR Title Consert Antenna Model STM Deployment Test |
|||||||||||||||||
NC Item Identification Consert Antenna on S/C |
Drawing Nr. RO-OCN-DW-3001 Issue 2 / Rev. C |
||||||||||||||||
Next higher Assembly ------- |
Procedure Nr. Attached |
||||||||||||||||
Subsystem ----- |
Model STM |
Supplier MPAE / Lindau
|
Purchase Order --------- |
||||||||||||||
NC Observation Date : 9.7.1999 Location : MPAe
Location |
NC detected during : Deployment testRO-OCN-PR-3003
|
||||||||||||||||
Description of NCR Unreliable deployment of reflector elements
|
Requirements violated
---------- |
||||||||||||||||
|
Initiator : W.Engelhardt / MPAE Dr. Nielsen / MPAE |
||||||||||||||||
Internal NRB Dispositions
|
Ref. To MoMs |
Classification
Minor |
|||||||||||||||
H/W-Modifications are required |
Customer Notification |
||||||||||||||||
Cause of NC Reflector elements stick in support ring |
Corrective Actions : Redesign of support ring
|
Verfication |
|||||||||||||||
Ref. To Failure Report
Test Report attached RO-OCN-TR-3003.1 |
|||||||||||||||||
Date : Name : Signature : |
PA 9.7.1999 W.Boogaerts |
Engineering 9.7.1999 W.Engelhardt |
Management 9.7.1999 Dr. E.Nielsen |
||||||||||||||
Customer NRB Dispositions (Class major , only ) |
Ref. To MoMs |
Verification |
|||||||||||||||
Finally Determined of NC |
Corrective / Preventativ Actions |
||||||||||||||||
Ref. To Failure Report |
|||||||||||||||||
Request for Waiver no |
Alert no |
Other related Documents |
|||||||||||||||
Reference |
Reference |
||||||||||||||||
NRB Approval Organisation : Name :
|
Chairman |
QA |
Project Manager |
NCR Close out |
|||||||||||||
Date , Signature |
Date,Signature |