esa estec |
Rosetta |
Request for Waiver/Deviation |
||||||||||
[1] Title |
RFW-Nr.: RO-OCN-RW-3004 |
|||||||||||
Issue/Rev. : |
||||||||||||
Mass of Consert Orbiter antenna |
Date : 01.08.1999 page 1 of 1 |
|||||||||||
Related NCR (if any) :
|
||||||||||||
[2] End Item(s) affected (hardware, software) : |
||||||||||||
Name |
CI-Number |
Model(s) |
||||||||||
Orbiter antenna of Consert instrument |
All |
|||||||||||
[3] Requirement/Interface Documents affected : |
||||||||||||
Specification/Drawing Title |
Number |
Issue |
Date |
appl. paragr. |
||||||||
EID-B |
1 |
15.01.1999 |
2.2.3.1 |
|||||||||
[4] Description of Deviation/Discrepancy/Non-Conformance :
The total weight of the antenna is 1447 g. This is 147 g more than the previous maximum. Caused by an increase of weight of the C-fibre masts. The increase is in the mass of the movable parts of the antenna.
|
||||||||||||
[5] Other Items or requirements (potentially ) affected :
None
|
||||||||||||
[6] Need for RFW and rationale for Acceptance :
The increased mass of the C-fibre masts is a consequence of "corrective action" associated with NCR: RO-CON-MPAE-NCR-001
|
||||||||||||
[7] Originator : Dr. E. Nielsen |
Sign. : |
Attachments |
||||||||||
Date : 1.8.1999 |
None |
|||||||||||
[8] Approvals : |
||||||||||||
Engineering Name/Date |
Product Assurance Name/Date |
CCB-Chairman Name/Date |
||||||||||
[ ] Appr. [ ] Rej. |
[ ] Appr. [ ] Rej. |
[ ] Appr. [ ] Rej. |
||||||||||
Co/Sub-Contractor |
[ ] Appr. [ ] Rej. |
[ ] Appr. [ ] Rej. |
[ ] Appr. [ ] Rej. |
|||||||||
[ ] Appr. [ ] Rej. |
[ ] Appr. [ ] Rej. |
[ ] Appr. [ ] Rej. |
||||||||||
Prime-Contractor |
[ ] Appr. [ ] Rej. |
[ ] Appr. [ ] Rej. |
[ ] Appr. [ ] Rej. |
|||||||||
ESA Project-Office |
[ ] Appr. [ ] Rej. |
[ ] Appr. [ ] Rej. |
[ ] Appr. [ ] Rej. |