esa estec

Rosetta

Request for Waiver/Deviation

[1] Title

RFW-Nr.: RO-OCN-RW-3006

 

Issue/Rev. : 1

Shock test suppression

Date : page 1 of

 

Related NCR (if any) :

 

[2] End Item(s) affected (hardware, software) :

   

Name

CI-Number

Model(s)

     

STM of Consert antenna

   
     
     

[3] Requirement/Interface Documents affected :

Specification/Drawing Title

Number

Issue

Date

appl. paragr.

         

EID B Table 4.2.1

       
         
         
         

[4] Description of Deviation/Discrepancy/Non-Conformance :

 

Shock test as described in the EID-B was not performed on the STM antenna

 

[5] Other Items or requirements (potentially ) affected :

 

 

[6] Need for RFW and rationale for Acceptance :

 

Shock will be done on the QM

 

[7] Originator : E. Nielsen

Sign. :

Attachments

 

Date : 11.08.1999

1 page

[8] Approvals :

 

Engineering

Name/Date

Product Assurance

Name/Date

CCB-Chairman

Name/Date

 

[ ] Appr.

[ ] Rej.

[ ] Appr.

[ ] Rej.

[ ] Appr.

[ ] Rej.

Co/Sub-Contractor

[ ] Appr.

[ ] Rej.

[ ] Appr.

[ ] Rej.

[ ] Appr.

[ ] Rej.

 

[ ] Appr.

[ ] Rej.

[ ] Appr.

[ ] Rej.

[ ] Appr.

[ ] Rej.

Prime-Contractor

[ ] Appr.

[ ] Rej.

[ ] Appr.

[ ] Rej.

[ ] Appr.

[ ] Rej.

ESA Project-Office

[ ] Appr.

[ ] Rej.

[ ] Appr.

[ ] Rej.

[ ] Appr.

[ ] Rej.